Problem
A product team that runs A/B tests on a conversion rate must promise a lift for the next year. The common shortcut raises the average past lift to the power of the number of planned experiments. It ignores that tests detect only some true effects and that past results are noisy. A missed target may be bad luck or an unreachable goal, and the shortcut cannot tell which.
Example from the article: a team ran 12 monthly A/B tests on a 1% baseline conversion with 100,000 users a month, split 50/50. Using the estimated lifts, it gained 80%, and the PM now asks for 2x next year.
Solution in brief
Fit a hierarchical model to past relative lifts and simulate future experiments from it. For each simulated true lift, compute the power of the fixed-size test and weight the log lift by that power. Multiply monthly results to get the distribution of cumulative lift and the chance of hitting the goal.
Questions this case answers
- How to forecast the cumulative effect a team will accumulate from a sequence of tests when only a fraction of true effects is detected
- How to estimate the probability of reaching a target cumulative effect from noisy historical estimates of past effects
- How to forecast the cumulative conversion lift an experimentation team will deliver in a year from its past A/B results?
- How to tell whether missing an annual lift target is bad luck or a sign the target was unrealistic?
Tools and methods
- Hierarchical Bayesian model on log relative lift — pools past experiments to estimate the distribution of effects the team produces.
- Power calculation per simulated effect — gives the chance that a test with this sample size detects the effect.
- Posterior simulation — turns the model into a distribution of cumulative lift over the year.
- Stan — fits the model and runs the power and forecast computations.
Google or a one-time email code. No password.