Your First Process Mining Project: How to Choose a Process to Optimize, Build a Team and Not Get Stuck at the Pilot Stage

27 Oct 2026

Problem

A first process mining project often ends with a digital twin and a pilot presentation. Then the work stops. In the 2025 Deloitte survey, the share of companies using process mining across the whole organization had barely changed in four years, and 41% named missing management support as a barrier (26% in 2021). Typical causes are no research question, a process with no engaged owner, event data that cannot be linked across documents, and no baseline KPIs.

Example from the article: 40,000 purchase requests a year, 12% returned for rework, 1.5 hours per return at 1,200 ₽ per hour: a potential saving of 8.64 million ₽ a year.

Solution in brief

Follow six steps based on the PM² methodology: research questions, choosing the process by three filters (economic potential, data availability, engaged owner), a team with named roles, a 6–10 week pilot with baseline KPIs, a scale/refine/stop decision, and regular monitoring. Success means an adopted change and a calculated effect, not a built digital twin.

Questions this case answers
  • How to pick the first process for an event-log analysis pilot when data quality, an engaged owner and measurable savings must all be present
  • How to move a one-off analytical study into a permanent working tool when ownership, baseline metrics and in-house skills are missing
  • How to choose the first business process for a process mining pilot
  • How to assemble a team and plan a 6–10 week process mining pilot with KPIs

Tools and methods

  • Process mining — AS-IS digital twin from an event log: variants, loops, returns, bottlenecks
  • PM² methodology — project stages and roles behind the six steps
  • Selection matrix — candidates scored 1–3 on three filters
  • Pilot / PoC — 6–10 weeks with checkpoints and a final decision