Problem
The VkusVill recommendations team ran every new ML model through a full A/B test of 3-4 weeks. Ideas queued up because long experiments held the audience. When a test showed a clear drop in metrics after a week, the team argued: analysts insisted on not stopping early, to avoid broken statistics, while product managers did not want to keep losing money for two more weeks.
Example from the article: a model change shows a visible drop in metrics one week into a four-week experiment, and the team spends days deciding whether to stop it.
Solution in brief
The team added "fast experiments": a model variant runs for about three days on roughly 10% of users, and the team only looks at the direction of the metric lines. Significance is not computed. A clear drop kills the hypothesis. No drop means only that the hypothesis may go to a full A/B test.
Questions this case answers
- How to screen out weak model variants within days when full controlled experiments take weeks and the queue of hypotheses keeps growing
- How to decide on early stopping of a failing experiment without breaking the statistics of the standard fixed-horizon test
- How to cut the queue of ML model hypotheses when every full A/B test takes 3-4 weeks?
- How to quickly drop a weak recommendation model without a full experiment?
Tools and methods
- Fast experiment — 3-7 day test on about 10% of users (down to 2.5% per group), read by metric direction only
- Reserved audience — about 10% of traffic kept free for fast tests while big experiments run on the other 90%
- Offline metrics and manual review — pre-launch checks of the model
- Change log — record of all tests per recommendation placement
Google or a one-time email code. No password.