Problem
EVRAZ's Kachkanar plant (KGOK) mines ore of 14-16% iron, among the lowest grades in the industry. The crushing and concentration lines are tuned several times per day or shift for an assumed grade (for example 15%), and the plant then runs on that assumption. When the grade drifts, tailings losses grow and profitability falls; even 0.1% matters here. One excavator moves about 5,000 cubic meters of ore a day, so a bucket cannot be sent to a laboratory.
Example from the article: a 2-hour batch loaded into the crusher has to blend rock of different grades so that the average comes out at 15%.
Solution in brief
Compute grade instead of sampling it. A geological block model gives the grade of every 2.5 m cube in the pit. Positioning data shows which block each excavator digs and which truck it loads. The same logic tracks the ore through transfer points and trains. The system then recommends where each truck unloads to keep the blend on target.
Questions this case answers
- How to estimate the quality of a physical material at every handling step when direct sampling of each batch is impossible
- How to blend inputs of varying quality so that each processing batch averages to the grade the downstream process was tuned for
- How to keep the iron grade of ore fed to a concentrator stable when the pit mines ore of 14-16% grade
- How to know the quality of ore in every truck and every train when samples cannot be taken from each bucket
Tools and methods
- Block geological model — 2.5 m cubes with iron grade
- Equipment positioning and dispatching — links excavator, truck and train positions to blocks in real time
- Transfer point block model — grade of rock unloaded there and loaded from it
- MES crushing system — predicts the grade of finely crushed ore, checked by a sampling tower every two hours