Problem
A team plans a product change it expects to lift a metric by 3%, but the traffic it can reach only gives a fair chance (power) to detect effects of 10% or larger. Teams in this position often feel discouraged from running the experiment, and then nobody sees unintended harm. The post defines a small sample by this gap between wanted and reachable precision, not by a user count. It assumes more than 1000 users, so standard methods work without small-sample corrections.
Example from the article: At Spotify most experiments have tens of millions of users, but some have only thousands, and those still run as experiments.
Solution in brief
Treat experimentation as a ladder of risk mitigation. Each step has a stronger claim and a higher sample size need: no evidence of harm, evidence of limited harm (non-inferiority), evidence of improvement. Start at the lowest step and climb. At each step, cut the required sample through metric choice, variance reduction, capping, exposure filters and test settings.
Questions this case answers
- How to bound the risk of a product change with an experiment whose sample cannot reach the precision needed to prove an improvement
- How to reduce the sample size required to detect or rule out an effect through metric, exposure and test-design choices
- How to get value from an experiment when the sample is too small to detect the effect we expect?
- How to introduce experimentation in a team that has no experience with non-inferiority margins?
Tools and methods
- Rollout with guardrail metrics, no non-inferiority margin (NIM) — step 1, tests for deterioration only
- Non-inferiority test with a large NIM — step 2, bounds the harm
- Minimum detectable effect (MDE), power analysis — step 3, sample size for improvements
- CUPED, A/A test, capping, exposure filters — cut variance and dilution
Google or a one-time email code. No password.